NO |
CLIENT |
PROJECT |
YEAR |
1. |
PETRONAS PENAPISAN SDN BHD |
Melaka |
|
Rental of 3 units 45 Ton and 2 units of 120 Ton hydraulic mobile cranes for shutdown jobs. Work was carried out on 24 hours daily basis |
|
|
2. |
TENGGARA CEMENT SDN BHD |
Cement Factory |
|
Rental of 300 Ton hydraulic Mobile Crane to lift 12 units of 52 ton vessels |
|
|
3. |
|
Rental of 300 Ton crawler crane with 120 Ton superlift attachment lifting a metering system, crawl and placed onto barge |
|
|
4. |
|
Rental of commetto multi axle trailer for the transportation of 8 units, 35 ton each transformer. Offloading at site using a 120 Ton hydraulic mobile crane |
|
|
5. |
|
Rental of 150 Ton crawler crane mounted onto 150 feet barge together with 1 unit 450hp for Muar Bypass Bridge Project |
|
|
6. |
PETRONAS EXPORT TERMINAL |
Kemaman, Terengganu |
|
Lifting and transportation of 4 Units of Heat Exchanger T831 by using a 400 Tons Crane at PGB Export Terminal Kemaman |
|
|
7. |
PETRONAS EXPORT TERMINAL |
Kemaman, Terengganu |
|
Lifting of one unit LPU Loading Arm and Reinstallation at PGB Export Terminal Kemaman by using crane 280 Tons on barge |
|
|
8. |
TRANSLIFT SDN BHD |
Petronas MG3 |
|
Rental of two units 45 ton and one unit 24 meter skylift for Petronas MG3 Project |
|
|
9. |
FOSTER WHEELER REVAMP |
Petronas Penapisan, Melaka |
|
Rental of 1 unit 55 meter Skylift |
Work was carried out on 24 hours daily basis |
|
|
10. |
AQEEL ENGINEERING SDN BHD |
|
Installation of New gas oxydizer for AGO Projects by using 500 Ton & 300 Ton cranes at GPPA Kerteh |
|
|
11. |
AQEEL ENGINEERING SDN BHD |
Kemaman, Terengganu |
|
Rental of 500Ton and 200Ton at Petronas Gs Processing Plant A, Paka, Terengganu |
|
|
12. |
|
Installation of New Piping System for AGO Projects by using 200 Ton & 45 Ton cranes |
|
|
13. |
|
Lifting of piping racking system for pipe displacement projects at GPPA Kerteh by using 4 units of 45 Ton crane |
|
|
14. |
PETRONAS EXPORT TERMINAL |
Kemaman, Terengganu |
|
Removal & Installation of Flare Tip at Petronas Gas Export Terminal, Kemaman using 600 Ton Crawler crane |
|
|
15. |
|
Removal & Installation of PM5-0202A/ 0204A Blower Motor by using 300 Ton crane at GPPA, Kerteh |
|
|
16. |
|
Heavylift of PLEM Structure of 75T c/w Flange Protector using 500 ton crane & low loader |
|
|
17. |
Petronas Gas Berhad |
Kemaman |
|
Crane rental for replacement of HP Flare Tip S3-932, Assembly & commissioning and piping repair works at S3-931/932 at Gas Processing Plant 3 (GPP3) using 300 ton crawler crane |
|
|
18. |
RANHILL WORLEY PARSONS S/B |
Polyethylene (M) Sdn Bhd |
|
Study & Detailed Design for the Installation of New Heat Exchanger PE-2-E-400 |
|
2009 |
19. |
|
Load Out of Barunia 20.9 Ton Flare using 150 Ton Mobile Crane |
|
2010 |
20. |
|
Rental, Service & Consultation of Load Test 120/20 Ton Overhead Crane at |
Stesen Janaelektrik Sultan Ismail Petra, Pergau, Jeli, Kelantan |
|
2010 |
21. |
|
Catalyst Change Out for 2010 Optimal Shutdown using Mobile Crane 500 ton |
|
2010 |
22. |
MALAYSIA MARINE & HEAVY ENG. |
|
Weighing for Gumusut Kakap PLQ, Generator Building and Flash Gas Compressor Skid |
|
2010 |