| NO |
CLIENT |
PROJECT |
YEAR |
| 1. |
| PETRONAS PENAPISAN SDN BHD |
| Melaka |
|
| Rental of 3 units 45 Ton and 2 units of 120 Ton hydraulic mobile cranes for shutdown jobs. Work was carried out on 24 hours daily basis |
|
|
| 2. |
| TENGGARA CEMENT SDN BHD |
| Cement Factory |
|
| Rental of 300 Ton hydraulic Mobile Crane to lift 12 units of 52 ton vessels |
|
|
| 3. |
|
| Rental of 300 Ton crawler crane with 120 Ton superlift attachment lifting a metering system, crawl and placed onto barge |
|
|
| 4. |
|
| Rental of commetto multi axle trailer for the transportation of 8 units, 35 ton each transformer. Offloading at site using a 120 Ton hydraulic mobile crane |
|
|
| 5. |
|
| Rental of 150 Ton crawler crane mounted onto 150 feet barge together with 1 unit 450hp for Muar Bypass Bridge Project |
|
|
| 6. |
| PETRONAS EXPORT TERMINAL |
| Kemaman, Terengganu |
|
| Lifting and transportation of 4 Units of Heat Exchanger T831 by using a 400 Tons Crane at PGB Export Terminal Kemaman |
|
|
| 7. |
| PETRONAS EXPORT TERMINAL |
| Kemaman, Terengganu |
|
| Lifting of one unit LPU Loading Arm and Reinstallation at PGB Export Terminal Kemaman by using crane 280 Tons on barge |
|
|
| 8. |
| TRANSLIFT SDN BHD |
| Petronas MG3 |
|
| Rental of two units 45 ton and one unit 24 meter skylift for Petronas MG3 Project |
|
|
| 9. |
| FOSTER WHEELER REVAMP |
| Petronas Penapisan, Melaka |
|
| Rental of 1 unit 55 meter Skylift |
| Work was carried out on 24 hours daily basis |
|
|
| 10. |
| AQEEL ENGINEERING SDN BHD |
|
| Installation of New gas oxydizer for AGO Projects by using 500 Ton & 300 Ton cranes at GPPA Kerteh |
|
|
| 11. |
| AQEEL ENGINEERING SDN BHD |
| Kemaman, Terengganu |
|
| Rental of 500Ton and 200Ton at Petronas Gs Processing Plant A, Paka, Terengganu |
|
|
| 12. |
|
| Installation of New Piping System for AGO Projects by using 200 Ton & 45 Ton cranes |
|
|
| 13. |
|
| Lifting of piping racking system for pipe displacement projects at GPPA Kerteh by using 4 units of 45 Ton crane |
|
|
| 14. |
| PETRONAS EXPORT TERMINAL |
| Kemaman, Terengganu |
|
| Removal & Installation of Flare Tip at Petronas Gas Export Terminal, Kemaman using 600 Ton Crawler crane |
|
|
| 15. |
|
| Removal & Installation of PM5-0202A/ 0204A Blower Motor by using 300 Ton crane at GPPA, Kerteh |
|
|
| 16. |
|
| Heavylift of PLEM Structure of 75T c/w Flange Protector using 500 ton crane & low loader |
|
|
| 17. |
| Petronas Gas Berhad |
| Kemaman |
|
| Crane rental for replacement of HP Flare Tip S3-932, Assembly & commissioning and piping repair works at S3-931/932 at Gas Processing Plant 3 (GPP3) using 300 ton crawler crane |
|
|
| 18. |
| RANHILL WORLEY PARSONS S/B |
| Polyethylene (M) Sdn Bhd |
|
| Study & Detailed Design for the Installation of New Heat Exchanger PE-2-E-400 |
|
2009 |
| 19. |
|
| Load Out of Barunia 20.9 Ton Flare using 150 Ton Mobile Crane |
|
2010 |
| 20. |
|
| Rental, Service & Consultation of Load Test 120/20 Ton Overhead Crane at |
| Stesen Janaelektrik Sultan Ismail Petra, Pergau, Jeli, Kelantan |
|
2010 |
| 21. |
|
| Catalyst Change Out for 2010 Optimal Shutdown using Mobile Crane 500 ton |
|
2010 |
| 22. |
| MALAYSIA MARINE & HEAVY ENG. |
|
| Weighing for Gumusut Kakap PLQ, Generator Building and Flash Gas Compressor Skid |
|
2010 |